Skip to main content

Bulgarian distribution centre growing in the snow

Date:

Author: Martin Fyn Aamand, Head of Communications & PR

Category: Logistics

See aerial photos from the construction site in Bozhurishte, Bulgaria.

The construction of JYSK’s new distribution centre in Bozhurishte, Bulgaria (DCB) is going according to plan.

Here you can see two aerial photos from the construction site, one from January 2018 and one from last summer:

Distribution centre Bozhurishte

Distribution centre Bozhurishte

300 new jobs

Contruction began on 30 May 2017, and once the distribution centre is finished, it will create approximately 300 permanent jobs in the area.

The distribution centre is expected to be ready for use in the autumn of 2018.

Facts about DCB

  • 2 high bays with a combined capacity of 121,632 pallets.
  • The high bays will be 166 metres long, 55 metres wide and 42.5 metres high.
  • The location means significant environmental advantages, as JYSK will save approx. 10 million trucking kilometres a year from goods sold in the Balkan area.

Latest news

How did the opening week in Morocco go?

JYSK Morocco is now open – how did the first week go?

- Opening JYSK’s first stores in Morocco was not just about launching a new market – it was the result of dedication, teamwork, and commitment.

Store opening Casablanca

Highlights from grand opening in Morocco

- To celebrate JYSK opening in Morocco, we have collected some of the best photos from the two store openings.

Morocco is ready

Video greeting from Morocco: "We are ready!"

- After months of preparations, JYSK Morocco is now ready. On 10 April, the first two stores will open in Casablanca.

Add comment

Remember to keep a nice tone :)

About JYSK

Careers

JYSK Head Office